Pages

Saturday 7 March 2015

Cement bags Consumption :

 Cement bags Consumption :

1) R.C.C  [1:2:4]    =   6.00 bags  per 1cum
2) R.C.C  [1:1.5:3] =  7.77 bags  per 1cum
                              
3)  UCR   [ 1:6]        =  1.60 bags per 1cum
4)  BBM   [ 1:6]   9"    =  0.27 bags per 1cum
5)  BBM   [ 1:4]   4"     =  0.11 bags per 1cum
                                  
6) PLASTER [1:4] 12mm thk     =  0.16 bags per 1sqm
7) PLASTER [1:6]  12mm thk    =  0.11 bags per 1sqm
8) PLASTER [1;4]  20 mm thk   =  0.26 bags per 1sqm
9) PLASTER [1;6]  20 mm thk   =  0.17 bags per 1sqm


10) FLOORING TILES  [25cm x 25cm]  mosaic tiles =  0.11 bags per 1sqm
                             11) IPS flooring    =  0.38 bags per 1sqm 

No comments:

Post a Comment